I standardized our VAV startup with a one-page checklist and a duct static reset loop (0.8 to 0.3 in. w.c.), and it cut fan kWh by 18% on a 120k sq ft office while trimming callbacks. If anyone wants the template or has tweaks for measuring box leakage and verifying diversity assumptions, I’ll share and compare notes.